Method · v0.1-draft

What this observatory will never collapse.

MMC Sentinel measures industrialisation and asks whether it improves system coherence. It does not certify buildings, and it does not cheerlead prefab.

We never use “sustainable”, “approved”, or “certified” as collapsed labels. We never treat an announcement as a verified factory or a delivered dwelling.

What is measured

MMC Intensity is the degree to which construction has moved from site production toward industrialised manufacture and assembly. Coherence Score asks whether the intervention improves the whole system or merely transfers entropy. They are never the same number.

Evidence grades

Verified, supported, reported, estimated, unknown. Unknown is a first-class output. Absence is not a low score.

Methods

method:mmc-intensity-0-1 · 0.1-draft

MMC Intensity

Degree to which a project or system has moved from site craft production toward industrialised manufacture and assembly. Not a sustainability rating.

Weighted composite of structure, façade, MEP, volumetric content, digital integration, and inverse of site-assembly dependency. Missing dimensions are omitted, not zeroed.

Never: We never treat MMC Intensity as a green rating. We never fill missing dimensions with zero.

method:coherence-0-1 · 0.1-draft

Coherence Score

Does the intervention improve the whole system, or merely transfer entropy elsewhere? Scored only when evidence can support a boundary.

No universal scalar is claimed. Dimensions are stored separately. Aggregate is withheld when coverage is insufficient.

Never: We never invent a coherence score to complete a dashboard. We never assume prefab, timber, local, or imported is automatically better.

method:penetration-0-1 · 0.1-draft

MMC Penetration Index

How much construction is being industrialised in a geography and period.

Never: We never report a single global penetration percentage as fact.

method:capacity-0-1 · 0.1-draft

Manufacturing Capacity Index

How much real production capability exists, separated from announced capability.

Never: We never equate announced capacity with operational capacity.

method:utilisation-0-1 · 0.1-draft

Capacity Utilisation Index

How much of announced or installed manufacturing capacity is actually being used.

Never: We never present utilisation as verified without production evidence.

method:pipeline-0-1 · 0.1-draft

Pipeline Confidence Index

How much of the announced MMC pipeline is likely to be delivered.

Never: We never count an announcement as a dwelling.

method:bankability-0-1 · 0.1-draft

MMC Bankability Index

Whether a system can obtain finance, insurance, warranties, certification and procurement acceptance.

Never: We never imply statutory approval from a lender term sheet.

method:friction-0-1 · 0.1-draft

Regulatory Friction Index

Difficulty of taking a product or system from factory to approved installation in a jurisdiction.

Never: We never treat friction as proof that a system is unsafe, or absence of friction as proof that it is.

method:eroei-shelter-0-1 · 0.1-research

Energy return on built outcome

Research framework: how efficiently societies convert energy, materials, labour and capital into durable useful shelter. Not a settled universal metric.

Never: We never claim a settled universal thermoeconomic metric in this version.

OneNetwork primitives

  • Entity / systemFactory, project, manufacturer, standard, policy, product.
  • ObservationA dated metric with an explicit unit and boundary.
  • Evidence / sourceThe document, register or image behind the observation.
  • ProvenanceHow the observation arrived, and what was excluded.
  • Model / methodThe calculation or transformation applied.
  • Intelligence objectA derived interpretation that can be inspected.
  • ValidationWhether an independent check has occurred.
  • ConfidenceShown separately from the claim. Never collapsed into a traffic light.
  • PermissionsWhat may be shown publicly.
  • DecisionA recorded choice that followed the intelligence.
  • OutcomeWhat happened after manufacture, installation or occupation.
  • LearningWhat the system should remember next time.

OneNetwork adapter is present. No live API is configured. Local IntelligenceObjects remain on MMC Sentinel and are labelled MOCK until registered.

Sources in this seed

SourcePublisherClassCoverage
MMC Sentinel Phase 1 seed catalogueMMC Sentinelmodelledestimated
Design for Manufacturing and Assembly (DfMA) — Building and Construction AuthorityBCA Singaporegovernmentsupported
HDB Prefabricated Prefinished Volumetric Construction programme notesHousing & Development Boardgovernmentsupported
National Construction CodeABCBstandards-bodysupported
PrefabAUS industry materialsPrefabAUScompanyreported
Australian insolvency and administration notices (public)ASIC / court noticesinsolvencysupported
Company announcements and investor materialsVarious issuerscompanyreported
State planning and housing agency portalsAustralian state agenciesplanningsupported
Lifecycle and embodied-energy literature on offsite constructionMultiple journalsacademicsupported
Japanese industrialised housing industry publicationsMLIT / industry federationsgovernmentreported
Chinese prefabrication and industrialised construction policy materialsMIIT / MOHURD / provincial sourcesgovernmentreported
CEC Group Limited (ASX:CEG) — delisting and insolvency recordASX / deListedinsolvencysupported