Australia

Australian MMC Pulse

How far is the transition, and how much of it is real? Demo values until verified. Announced versus verified is the point.

MOCK

As of 2026-09-14 · DEMO seed — not a live ingest

Verified active MMC projects

Reported

0 verified / 4 on file

Announced
4
Verified
0 independently verified in this seed

Seed catalogue only. Announced programmes are not verified dwelling counts.

Open

Dwellings under manufacture

Unknown

Unknown / insufficient evidence

No factory production records are connected.

Open

Dwellings installed YTD

Unknown

Unknown / insufficient evidence

Installation is a different object from announcement.

Open

Operational factories

Supported

4

Announced
8
Verified
4 in seed (supported, not metered)

Operational in the catalogue is not verified utilisation.

Open

Factories under construction

Reported

0

None in the current seed.

Open

Announced factories

Reported

1

Includes vapourware held on purpose.

Open

Closures / administrations

Supported

3

Strongbuild, CEC Group, ARK Homes (historic). Closures are first-class objects, not deleted rows.

Open

Estimated manufacturing capacity

Unknown

Unknown / insufficient evidence

Nameplate figures are not summed.

Open

Verified manufacturing capacity

Unknown

0 plants independently metered

This is the honest national number in Phase 1.

Open

Utilisation

Unknown

Unknown

Utilisation requires output, not floor area.

Open

Major tenders

Reported

2 on file (demo)

See /tenders. Not a live procurement feed.

Open

Capital committed

Unknown

Unknown / insufficient evidence

Announced investment is not committed capital.

Open

Pipeline confidence

Estimated

Low–moderate (directional)

Method 0.1-draft. Administrations pull the index down.

Open

Median approval time

Unknown

Unknown / insufficient evidence

Will be a pulse metric once planning records are ingested.

Open

Median installation time

Unknown

Unknown / insufficient evidence

Planned versus actual is the object, not marketing duration.

Open

Index placeholders

Each index has a method, geography, period, confidence and coverage.

0.1-draft

MMC Intensity

Degree to which a project or system has moved from site craft production toward industrialised manufacture and assembly. Not a sustainability rating.

Method

0.1-draft

Coherence Score

Does the intervention improve the whole system, or merely transfer entropy elsewhere? Scored only when evidence can support a boundary.

Method

0.1-draft

MMC Penetration Index

How much construction is being industrialised in a geography and period.

Method

0.1-draft

Manufacturing Capacity Index

How much real production capability exists, separated from announced capability.

Method

0.1-draft

Capacity Utilisation Index

How much of announced or installed manufacturing capacity is actually being used.

Method

0.1-draft

Pipeline Confidence Index

How much of the announced MMC pipeline is likely to be delivered.

Method

0.1-draft

MMC Bankability Index

Whether a system can obtain finance, insurance, warranties, certification and procurement acceptance.

Method

0.1-draft

Regulatory Friction Index

Difficulty of taking a product or system from factory to approved installation in a jurisdiction.

Method