Brisbane, Queensland · Inner-urban residential tower

443 Queen Street, Brisbane

SupportedMOCKOccupancy

Australian inner-urban prefabrication as practiced, not as promised in a press release.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
/

Evidence confidence · 52%

MMC Intensity

74 / 100

Estimated
Structure82
Façade78
MEP55
Volumetric content35
Digital integration70
Site assembly dependency40

Evidence confidence · 52%

A serious Australian industrialised project. Intensity is not occupancy proof of whole-system savings.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Cost, defects, embodied energy and operating energy are not assembled as an evidence pack here.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
Prefabricated structural system — reported
facade
Prefabricated — reported
bathrooms
Prefabricated wet areas — reported

Timeline

Planned versus actual, when both exist.

  1. Announcement

    2010s

  2. Design

  3. Approval

  4. Contract

  5. Manufacture

  6. Shipping

  7. Installation

  8. Completion

  9. Occupancy

    Reported complete

Supply chain

Performance

Unknown / insufficient evidence