Lihir Island, Papua New Guinea · Mining camp / workforce accommodation

Lihir Island camp (ARK — reported)

ReportedMOCKCompletion

Historic ARK case: a reported 800-person camp with company claims of Australian-standard documentation. Not an Australian dwelling factory, and not treated as verified PNG occupancy data.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
/

Evidence confidence · 26%

MMC Intensity

78 / 100

Estimated
Structure80
Façade70
MEP65
Volumetric content85
Digital integration40
Site assembly dependency30

Evidence confidence · 26%

Intensity is directional if the published camp method is accurate. Not a housing-supply object.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Remote camp logistics, galvanising and sea freight are first-class energy terms. No whole-system account is attached.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
Double-storey modular accommodation — reported
finishes
Turnkey FF&E — reported

Timeline

Planned versus actual, when both exist.

  1. Announcement

  2. Design

  3. Approval

  4. Contract

  5. Manufacture

  6. Shipping

  7. Installation

  8. Completion

  9. Occupancy

Supply chain

Performance

Unknown / insufficient evidence