
Lihir Island, Papua New Guinea · Mining camp / workforce accommodation
Lihir Island camp (ARK — reported)
Historic ARK case: a reported 800-person camp with company claims of Australian-standard documentation. Not an Australian dwelling factory, and not treated as verified PNG occupancy data.
- Dwellings
- Unknown / insufficient evidence
- GFA
- Unknown / insufficient evidence
- Value
- Unknown / insufficient evidence
- Duration planned / actual
- — / —
Evidence confidence · 26%
MMC Intensity
78 / 100
Evidence confidence · 26%
Intensity is directional if the published camp method is accurate. Not a housing-supply object.
Not a sustainability rating. High intensity can still fail coherence.
Coherence Score
Unknown / insufficient evidence
Remote camp logistics, galvanising and sea freight are first-class energy terms. No whole-system account is attached.
- Embodied energy · Unknown · unknown
- Transport / logistics · Unknown · unknown
- Construction time · Unknown · unknown
Building anatomy
Factory → transport → site → operation, where known.
- structure
- Double-storey modular accommodation — reported
- finishes
- Turnkey FF&E — reported
Timeline
Planned versus actual, when both exist.
Announcement
—
Design
—
Approval
—
Contract
—
Manufacture
—
Shipping
—
Installation
—
Completion
—
Occupancy
—
Supply chain
- Manufacturer · ARK Homes
- Factory · ARK Homes (historic)
- System · 3D volumetric
- supplies · mmc:factory:au:qld:ark-homes → mmc:project:pg:ark-lihir-camp
Performance
Unknown / insufficient evidence