
New South Wales · Modular housing programme
NSW modular social / temporary housing (programme)
Australia as a transition market: public programmes exist; verified dwelling-years and factory utilisation remain thin.
- Dwellings
- Unknown / insufficient evidence
- GFA
- Unknown / insufficient evidence
- Value
- Unknown / insufficient evidence
- Duration planned / actual
- — / —
Evidence confidence · 40%
MMC Intensity
70 / 100
Evidence confidence · 40%
Programme objects mix temporary, social and disaster response. Do not collapse into one success metric.
Not a sustainability rating. High intensity can still fail coherence.
Coherence Score
Unknown / insufficient evidence
Speed of installation can improve shelter service while shifting cost into logistics, residual value and site servicing. Not scored.
- Embodied energy · Unknown · unknown
- Transport / logistics · Unknown · unknown
- Construction time · Unknown · unknown
Building anatomy
Factory → transport → site → operation, where known.
- structure
- Volumetric modules — programme mix
Timeline
Planned versus actual, when both exist.
Announcement
2020s
Design
—
Approval
—
Contract
—
Manufacture
—
Shipping
—
Installation
—
Completion
—
Occupancy
—
Supply chain
- Manufacturer · Fleetwood Australia
- Factory · Fleetwood Western Australia
- System · 3D volumetric
Performance
Unknown / insufficient evidence