Tengah, Singapore · Public housing township

Tengah (HDB, DfMA)

SupportedMOCKInstallation

Governance and digital delivery as industrialisation, not only modules on trucks.

Dwellings
Unknown / insufficient evidence
GFA
Unknown / insufficient evidence
Value
Unknown / insufficient evidence
Duration planned / actual
/

Evidence confidence · 60%

MMC Intensity

80 / 100

Estimated
Structure82
Façade68
MEP86
Volumetric content72
Digital integration88
Site assembly dependency32

Evidence confidence · 60%

Digital delivery and MEP prefabrication are first-class in the Singapore method. Seed score is directional.

Not a sustainability rating. High intensity can still fail coherence.

Coherence Score

Unknown / insufficient evidence

Township-scale energy, transport and ecological boundary not assembled.

  • Embodied energy · Unknown · unknown
  • Transport / logistics · Unknown · unknown
  • Construction time · Unknown · unknown

Building anatomy

Factory → transport → site → operation, where known.

structure
DfMA / PPVC mix — programme-level
mep
Prefabricated MEP as policy object

Timeline

Planned versus actual, when both exist.

  1. Announcement

    2016+

  2. Design

  3. Approval

  4. Contract

  5. Manufacture

  6. Shipping

  7. Installation

  8. Completion

  9. Occupancy

    Staged

Supply chain

Performance

Unknown / insufficient evidence